Box culvert installation method Box bearing horizontal pulling method "NETIS" registered
【Features】
○ Smooth installation work can be carried out even in narrow construction yards.
○ The loading operation (crane work) and installation work (horizontal pulling work) can be separated, allowing for rapid construction.
○ The excavation width is smaller compared to conventional methods.
○ Once the cover plates are installed, work can be conducted underground, allowing traffic above to remain open.
○ There is no need for the crane to move during installation, allowing for placement at a single lowering location.
○ Ideal for construction in densely populated residential areas, under busy roads, and for crossings under bridges and railways.
○ Installation work is possible even in areas with overhead obstacles such as elevated bridges and power lines.
○ The friction between the box culvert and the foundation is low, reducing the vertical PC tension to below 50%.
○ Construction is possible with a longitudinal slope of up to 10%.
*For more details, please inquire.